2025 SeaPerch Season Resources
Pool Course Build Manual - 2025 SeaPerch Challenge
Pool Course Build Manual - 2025 SeaPerch Challenge
  • 2025 International SeaPerch Challenge Pool Courses Build Guide
  • Resources
  • General Notes
  • Section 1: Obstacle Course Build Guide
    • 1.1 Suspended Obstacle Course
    • 1.2 Obstacle Course Hoops
    • 1.3 Suspension Ropes
    • 1.4 Pool Floor Obstacle Course
  • Section 2: Mission Course Build Guide
    • 2.1 Task Platforms
    • 2.2 Surface Vessel
    • 2.3 Back Platform Assembly
    • 2.4 Bio-Bucket Hatch
    • 2.5 Coral Tree
    • 2.6 Deep Dive Platform
    • 2.7 Front Platform Assembly
    • 2.8 Marine Life
    • 2.9 Sensors
  • Construction Tips
  • Regional Course Tips
Powered by GitBook
On this page
  • Overview
  • Bio-Buckets Installation
  • Hoop Support Pipe Assembly
  • Bio-Bucket Hatch Installation
Export as PDF
  1. Section 2: Mission Course Build Guide

2.3 Back Platform Assembly

Previous2.2 Surface VesselNext2.4 Bio-Bucket Hatch

Last updated 8 months ago

Overview

Bio-Buckets Installation

Bio-Bucket modification

The Hanging Coral is placed in one of the Bio-Buckets for the beginning of each team's run. If the Hanging Coral is lying on the bottom of the Bio-Bucket it will be difficult for the ROV to lift. The front end of one of the Bio-Buckets needs to be cut as shown.

Heavy duty scissors, sheet metal (tin) snips, or small hand saws can be used to cut the Bio-Bucket. Smooth any sharp edges using a file or sandpaper.

Attach two Bio-Buckets to the Back Platform.

Hoop Support Pipe Assembly

Bio-Bucket Hatch Installation

Attach the Bio-Bucket Hatch and Hoop Support Pipe Assembly to the Back Platform.

Back Platform Assembly

Item
Unit
Qty

Back Task Platform with Solid Base Plate

Each

1

Bio-Bucket Hatch Assembly

Each

1

Bio-Buckets - Plastic Storage Basket, 10" L x7.5" W x 4" H (may substitute for other sizes)

Each

2

1" x 1/2" Sch 40 Reducing Bushing

Each

1

1” PVC Snap-On Saddle Tee

Each

1

1/2” Sch 40 PVC Pipe X 24" Long

Each

1

8" Cable Ties

Each

9

#8 X 5/8" Stainless Steel Flanged Head Self-Drilling Screw

Each

2

Fully Assembled Back Platform
Drawing
Drawing