Two task platforms are required for the mission course. The two platforms differ only in the corrugated plastic platform base. Use following illustration as a guide to construct two task platforms. See the subsequent illustrations for the two different platform base plate details.
Use frame as guide to position cable tie slots. Cable tie slot dimensions are non-critical. Assure slot is large enough for cable tie. Punch or cut slots for cable ties. A large flat blade screwdriver works best for punching slots in plastic sheet.
Tape holes if using task platform base plates with 8 holes from previous years (shown below). White duct tape is preferred to cover the holes, but other suitable tape will work.
The blue tape around the small hole increases the visibility of the hole during competition.
Task Platform Parts List (quantities are for two platforms)
1” Sch 40 PVC Tee (DURA brand – may be substituted with other brands, but refer to item 3 in the General Construction Notes section above)
Each
16
1" Sch 40 PVC Pipe x 16.5" long (16 needed if not suspending course)
Each
24
Polypropylene Corrugated Sheet, 0.157" Thick, 36" X 36" (Optional for pool floor course)
Each
2
#8 X 5/8" Stainless Steel Flanged Head Self-Drilling Screw
Each
40
8" Cable Tie (Only needed if using Polypropylene sheet)
Each
24
Blue Duct Tape
As req'd
Green Duct Tape
As req'd