2025 SeaPerch Season Resources
Pool Course Build Manual - 2025 SeaPerch Challenge
Pool Course Build Manual - 2025 SeaPerch Challenge
  • 2025 International SeaPerch Challenge Pool Courses Build Guide
  • Resources
  • General Notes
  • Section 1: Obstacle Course Build Guide
    • 1.1 Suspended Obstacle Course
    • 1.2 Obstacle Course Hoops
    • 1.3 Suspension Ropes
    • 1.4 Pool Floor Obstacle Course
  • Section 2: Mission Course Build Guide
    • 2.1 Task Platforms
    • 2.2 Surface Vessel
    • 2.3 Back Platform Assembly
    • 2.4 Bio-Bucket Hatch
    • 2.5 Coral Tree
    • 2.6 Deep Dive Platform
    • 2.7 Front Platform Assembly
    • 2.8 Marine Life
    • 2.9 Sensors
  • Construction Tips
  • Regional Course Tips
Powered by GitBook
On this page
Export as PDF
  1. Section 1: Obstacle Course Build Guide

1.4 Pool Floor Obstacle Course

Previous1.3 Suspension RopesNextSection 2: Mission Course Build Guide

Last updated 8 months ago

Rebar provides a convenient method of weighting the obstacle course, however weights may be used.

Pool Floor Obstacle Course Frame Parts List

Item
Unit
Qty.

1/2" Sch 40 PVC Elbow

Each

2

1/2" Sch 40 PVC Cross

Each

3

1/2" Sch 40 PVC Tee

Each

3

1/2" Sch 40 PVC Pipe X 6" Long

Each

2

1/2" Sch 40 PVC Pipe X 12" Long

Each

9

1/2" Sch 40 PVC Pipe X 24" Long

Each

10

#4 Rebar (1/2" Dia.) X 24" Long

Each

4

#8 X 5/8" Stainless Steel Flanged Head Self-Drilling Screw

Each

42

Obstacle Course Construction Detail
Rebar Installation Detail
Hoop Installation